Welcome Pratacultural Science,Today is
The construction methods of golf course clearance engineering in the forest land[J]. Pratacultural Science, 2011, 5(9): 1601-1605.
Citation: The construction methods of golf course clearance engineering in the forest land[J]. Pratacultural Science, 2011, 5(9): 1601-1605.

The construction methods of golf course clearance engineering in the forest land

  • In recent years, the number of golf course is increasing and the construction of golf course is prevalent. The unreasonable construction method, however, causes the great negative effect on environments around the golf course. Therefore, it is urgent to construction an environmentallyfriendly golf course by scientific and more efficient way. On the basis of characteristics of golf course in the forest land, this study proposed the clearance methods consisted of four stages, drawing clearance, complete clearance, partial clearance, temporary clearance, and the processes and tasks of each stage were introduced in detail. From start to completion of golf courses, measurement was considered as a key task in the construction process, and the theory and application of the measurement around the clearance engineering work was also described in this study.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return